
San Tan Dry Co. is an East Valley dry-out crew, not a call center. We extract the water, set the drying equipment, and take meter readings until the structure hits dry standard. Then we hand you the log for your insurance claim.
No renting gear after we see the job. The standard load-out:
| Gear | What it does | When it comes off the truck |
|---|---|---|
| Truck-mount extractor | Pulls standing water, weighted extraction for carpet | First hour, every water job |
| LGR dehumidifiers | Pulls moisture out of the air and the structure | Set day one, runs until readings hit standard |
| Air movers | Moves dry air across wet walls and floors | Placed from the moisture map, adjusted daily |
| Pin & pinless meters | Reads moisture inside drywall, baseboard and subfloor | Every visit. The numbers decide when we are done |
| HEPA air scrubber | Filters the air inside containment | Mold and sewage jobs, before anything opens up |
| Containment plastic & tape | Seals the work zone off from the rest of the house | Whenever a wall opens or mold is present |
A dry-out is a sequence, and skipping steps is how a water job turns into a mold job three weeks later. This is the full sequence, the way it runs in Queen Creek, Gilbert, Chandler, Mesa and San Tan Valley homes.
Leaks, bursts, slab leaks and floods. Extraction, measured drying and verification across the East Valley, with Mesa our biggest water market.
Containment first, then removal and HEPA filtration. We fix the moisture source too, because mold without a water fix is just mold scheduled to return.
Board-up, soot and smoke cleanup, odor work, and drying out the water the fire department left behind. Scope in writing before work starts.
Sewage backups are category 3: protective gear, containment, sanitation, disposal rules followed. Monsoon water gets the same treatment, minus the hazmat.
Half the calls we run in the East Valley are not floods. They are slow leaks that have been feeding a wall for weeks. These are the tells:
Where is the water, is it still coming, and what is wet. That is enough to roll the right truck.
Source found, moisture mapped, scope explained in plain language before any equipment is set.
Water out, gear placed to the map, containment up if the job needs it.
We come back, read the materials, adjust the gear, and log every number.
When the readings hit standard, gear comes out and you get the full log for your claim.